Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Sequential vs Concurrent Station Handling
#1
I have a setup where I am controlling a light for my seedling starting area. During the time that the light is on (roughly 14 hours a day) I would like to be able to turn an aquarium pump on to water.  With the light on, when I turn the pump on the light program turns itself off.  I have unchecked the sequential box and have experimented with the individual duration option, but each time I turn the pump on during the time the light program is running the light program is cancelled.  I am using the an exact version of the 74HC595 Shift Register DIY relay interface described in the Wiki to control my solid state 12 volt relays.

Is what I am attempting to do even possible with the SIP Software? It may be that the output to the shift registers does not include the already running program bit, in which case might this not be a new feature that allows better flexibility as a controller?
Reply


Messages In This Thread
Sequential vs Concurrent Station Handling - by 22ndst - 2021 Apr 13, 02:06 PM

Forum Jump:


Users browsing this thread: 3 Guest(s)